Reading the stripboard

A strip shows its setting, location, time of day, pages, scene numbers, start time and cast. Each day adds lunch, company moves and wrap on its own. Days with a date also show dawn, sunrise, golden hour, sunset and dusk.

The header

The line under Shoot Schedule gives the total pages and the number of days. On a phone, the buttons fold into an Actions menu.

A day

The day header shows, left to right:

  1. Shoot Day and its number, then the date if it has one.
  2. Its shooting window, from First Shot to the end of the last strip, once a first shot is set.
  3. Call times, as Crew, Cast and Set.
  4. Length in hours, and page count.
Shoot Day 1's header

An empty day reads Drop strips here.

A strip

Each strip shows:

  1. INT or EXT.
  2. The location name.
  3. The time of day, such as DAY, NIGHT or DUSK.
  4. Its length in pages, in eighths.
  5. The scene numbers it holds.
  6. The time it starts, on the right.
  7. A tag for each character in it.
The Rialto night strip

If a scene has storyboard panels, its strip lists only the characters who appear in those panels. That keeps actors off days where they aren’t in any shot.

CONTINUOUS, SECONDS LATER and LATER are not times of day. A scene headed that way takes the time of day of the scene before it. If it moves to a new place moments later, like bedroom to kitchen, the app counts both places as one site. A scene with no location gets a strip of its own.

A scene longer than a day is split into parts, such as 20 pt 1/3, and shot over several days.

How times are worked out

Each eighth of a page takes 20 minutes. A full page is 2 hours 40 minutes. The day starts at First Shot, or 10:00 AM if there isn’t one.

Four kinds of line fill in by themselves:

  1. Lunch, one hour long, after four hours of work.
  2. Set Move, 15 minutes, when the next strip is in another room of the same site. It names both places.
  3. Company Move, one hour, when the next strip is at another site.
  4. WRAP, at the end of the last strip.

Two locations are one site when the script cuts between them moments later, or when they share an address or sit within 150 metres on the map. Give a location its address to fix a site the app got wrong.

Day 1 from first shot to WRAP

Sun times

When a day has a date, a column on the left marks Dawn, Sunrise, Golden, Sunset and Dusk beside the strips they fall near. The times are worked out for that date at the day’s first location with a Latitude and Longitude. If no location on the day has them, the app uses Los Angeles on Los Angeles time.

The app finds the time zone from the same Latitude and Longitude, so the times read on the clock at the location, with daylight saving where it applies. Everyone on the project sees the same times, wherever their own computer is.

With sun times on, two warnings can show on a strip:

  1. DAY FOR NIGHT: a night or evening scene set to shoot before dusk.
  2. NIGHT FOR DAY: a daytime interior set to shoot after dusk.

Unscheduled

The Unscheduled list of strips that are not on any day

Strips on no day wait under Unscheduled, faded. Drag one onto a day to place it. When this list is empty, every scene has a day.

Weekends

Weekends: Off counts dates Monday to Friday from the project’s start date. Weekends: On counts every day. It only changes dates the app counts for you, not dates you typed in.

Versions

The bar over the board holds a Version menu, a note, and a blue Script tag. The tag names the script the version was made for, as title and revision. A version that has no script says No script recorded.

The project has one official version: V1, then V2, and so on. Call sheets, the shot list and the crew app read it. Nobody edits it in place. Your first edit makes your own copy, named for you, such as V1 – Lawrence W. Every edit after that lands on your copy, so nobody writes over anybody. The note on the bar says which version you are looking at.

Pick any version in the menu to look at it. Other people’s copies and older versions are read only.

A manager makes the next version. Make next version asks whose copy becomes V2, and V2 is then what everything reads. Every copy stays. More holds:

  1. Rename, for an official version. Managers only.
  2. Change script, if the tag is wrong. This changes the tag and nothing on the board.
  3. Next version from script: fresh strips built from the scenes, and no days. Managers only.
  4. Deleted versions, to bring one back.
  5. Delete, for your own copy. A manager can also delete someone’s copy or an older version. The version call sheets read can’t be deleted, and neither can one a budget is based on.

When a manager makes the next version, each call sheet moves to the same day in it. If that copy dropped the day, or the version came from the script, the call sheet stays on the old version.

A script import never moves a version. When scenes come in that no strip holds, a banner says how many. Add them makes new unscheduled strips for them and sets the version’s script tag to the script you imported last.

Edit a strip

Right-click a strip, or click the dots on its right. The menu holds:

  1. Edit strip: location, setting, time of day and a note. The note shows under the strip.
  2. Duplicate.
  3. Take off this day, which sends it to Unscheduled.
  4. Move to, with a line for each other day.
  5. Delete strip. The scenes stay in the project and come back as new scenes you can add.

Edit strip also lists the strip’s scenes. Split here starts a new strip at a scene. Move to puts a scene on another strip or on a strip of its own. Merge this strip into joins two strips.

Generate Schedule lays the strips out as days. It does not rebuild them, so your edits stay.

Still stuck?Ask in the Discord